Wastewater Facilities

 

 

Jervis Sewage Pump Station

 

MTS was contracted to upgrade the existing MCC and ACP at the Jervis Pump Station.  The scope of work required the replacement of one out-of-date Westinghouse MCC that had 3-200HP and 3-75HP and circuit breakers servicing other loads such as LDPs, CDP, unit heater, etc.  All pumps are controlled by the PLC/HMI/SCADA. The existing ACP was replaced and the PLC was upgraded to new Allen Bradley ControlLogix.

Lulu Island Wastewater
Treatment Plant

 

In order to maintain full operations under emergency conditions during significant BC Hydro power outages, MTS completed a conceptual study to determine the scope of work required to operate the plant in island mode and provided class 4 construction cost estimates and consulting engineering estimates to complete the scope.

Vancouver Sewerage Area Emergency Backup Power

 

MTS was retained to complete an options evaluation to determine the feasibility of standby emergency backup power at Chilco, Columbia, Harbour, Hudson, Jervis, Kent and Willingdon wastewater pump stations located in the Vancouver Sewerage Area (VSA).

bottom of page